Toadfrogs

The Tile Guy Arrvied

I came home at lunch time to find a young Russian guy tiling the back of our tub. I had no idea he was going to be at our house until midnight. (The guy worked 16 hours!) The tub area did get done and the floor will be tomorrow.

It seems he and Wade had a misunderstanding. Wade showed him our materials and the design. Tony thought we had all large tiles. He didn’t realize how many small tiles would have to be cut for the shower area. It meant a lot more time and would have changed his original quote. When Wade realized all of this he told Tony he would pay more, but Tony wouldn’t hear of it. He wanted to stand by his quote. I think a big tip is in order.

Leave a Reply